mirror of
https://github.com/fleschutz/PowerShell.git
synced 2025-04-04 06:20:42 +02:00
Update astronomy.csv
This commit is contained in:
parent
4b89df73f1
commit
8ccc88cc35
@ -11,6 +11,7 @@ ACD,Amplitude Calibration Device (ALMA)
|
|||||||
ACM,"Asteroids, Comets, and Meteors"
|
ACM,"Asteroids, Comets, and Meteors"
|
||||||
ACe,Astaldi Cimolai EIE (Consortium)
|
ACe,Astaldi Cimolai EIE (Consortium)
|
||||||
ADA,ALMA Department of Administration
|
ADA,ALMA Department of Administration
|
||||||
|
ADCS,Attitude Determination and Control
|
||||||
ADO,ALMA Director’s Office
|
ADO,ALMA Director’s Office
|
||||||
ADS,International Italian optics company working on the DSM for the VLT
|
ADS,International Italian optics company working on the DSM for the VLT
|
||||||
AEM,ALMA construction consortium
|
AEM,ALMA construction consortium
|
||||||
@ -23,6 +24,7 @@ AIT,"Assembly, Integration and Test"
|
|||||||
AIV,"Assembly, Integration and Verification"
|
AIV,"Assembly, Integration and Verification"
|
||||||
AJ,The Astronomical Journal
|
AJ,The Astronomical Journal
|
||||||
ALMA,Atacama Large Millimeter/submillimeter Array
|
ALMA,Atacama Large Millimeter/submillimeter Array
|
||||||
|
AM0,Air Mass Zero (Space Vacuum)
|
||||||
AMBER,"Astronomical Multi-BEam combineR (VLTI Instrument)"
|
AMBER,"Astronomical Multi-BEam combineR (VLTI Instrument)"
|
||||||
AN,"Journal, Astronomische Nachrichten"
|
AN,"Journal, Astronomische Nachrichten"
|
||||||
Antu,VLT Unit Telescope 1
|
Antu,VLT Unit Telescope 1
|
||||||
@ -38,6 +40,7 @@ ARAL,Alignment facility for the VLTI
|
|||||||
ARC,"ALMA Regional Centre, or Ames Research Center"
|
ARC,"ALMA Regional Centre, or Ames Research Center"
|
||||||
ArTeMiS,Bolometric camera for APEX
|
ArTeMiS,Bolometric camera for APEX
|
||||||
ASAC,ALMA Science Advisory Committee
|
ASAC,ALMA Science Advisory Committee
|
||||||
|
ASAL,Agence Spatiale Algerienne
|
||||||
ASIAA,"East Asia FEIC (ALMA)"
|
ASIAA,"East Asia FEIC (ALMA)"
|
||||||
ASIC,Application Specific Integrated Circuit
|
ASIC,Application Specific Integrated Circuit
|
||||||
ASSIST,Adaptive Secondary Setup and Instrument Simulator (AOF test bench)
|
ASSIST,Adaptive Secondary Setup and Instrument Simulator (AOF test bench)
|
||||||
@ -203,6 +206,7 @@ IRO,International Relations Office
|
|||||||
ISAAC,Infrared Spectrometer And Array Camera (VLT)
|
ISAAC,Infrared Spectrometer And Array Camera (VLT)
|
||||||
ISERD,Israeli inter-ministerial agency for R&D cooperation with Europe
|
ISERD,Israeli inter-ministerial agency for R&D cooperation with Europe
|
||||||
ISM,International Staff Member
|
ISM,International Staff Member
|
||||||
|
ISRO,Indian Space Research Organisation
|
||||||
ISS,International Space Station
|
ISS,International Space Station
|
||||||
IT,Information Technology
|
IT,Information Technology
|
||||||
ITAR,International Traffic in Arms Regulations
|
ITAR,International Traffic in Arms Regulations
|
||||||
@ -298,6 +302,7 @@ NTT,New Technology Telescope
|
|||||||
NUVA,Network for UltraViolet Astrophysics
|
NUVA,Network for UltraViolet Astrophysics
|
||||||
OAA,Arcetri Astrophysical Observatory
|
OAA,Arcetri Astrophysical Observatory
|
||||||
OBAMA,Optical Bidule for Aberration Measurement on the ATs
|
OBAMA,Optical Bidule for Aberration Measurement on the ATs
|
||||||
|
OBC,On-Board Computer
|
||||||
OCA-NICE,Cote d’Azur Observatory (Observatoire de la Cote d’Azur)
|
OCA-NICE,Cote d’Azur Observatory (Observatoire de la Cote d’Azur)
|
||||||
ODG,Office of the Director General
|
ODG,Office of the Director General
|
||||||
OECD,Organisation for Economic Co-operation and Development
|
OECD,Organisation for Economic Co-operation and Development
|
||||||
@ -335,6 +340,7 @@ PMD,Project Management Department
|
|||||||
PMPD,Performance Management and Professional Development
|
PMPD,Performance Management and Professional Development
|
||||||
PRIMA,Phase-Referenced Imaging and Micro-arcsecond Astrometry facility (VLTI)
|
PRIMA,Phase-Referenced Imaging and Micro-arcsecond Astrometry facility (VLTI)
|
||||||
PSF,Point Spread Function
|
PSF,Point Spread Function
|
||||||
|
PSLV,Polar Satellite Launch Vehicle
|
||||||
PTP,Precision Time Protocol
|
PTP,Precision Time Protocol
|
||||||
Q,Quarter
|
Q,Quarter
|
||||||
QSO,"Quasi Stellar Object, quasar"
|
QSO,"Quasi Stellar Object, quasar"
|
||||||
@ -380,6 +386,7 @@ SPT,South Pole Telescope
|
|||||||
SSDF,Science Support Discretionary Fund
|
SSDF,Science Support Discretionary Fund
|
||||||
SSED,Software System Engineering Department
|
SSED,Software System Engineering Department
|
||||||
SSWG,Science Strategy Working Group
|
SSWG,Science Strategy Working Group
|
||||||
|
SSS,Surrey Space Centre
|
||||||
ST-ECF,Space Telescope European Coordination Facility
|
ST-ECF,Space Telescope European Coordination Facility
|
||||||
STC,Scientific Technical Committee
|
STC,Scientific Technical Committee
|
||||||
STFC,Science and Technology Facilities Council (UK)
|
STFC,Science and Technology Facilities Council (UK)
|
||||||
@ -398,7 +405,7 @@ ToO,Target of Opportunity
|
|||||||
TRAPPIST,TRAnsiting Planets and PlanetesImals Small Telescope
|
TRAPPIST,TRAnsiting Planets and PlanetesImals Small Telescope
|
||||||
TRR,Test Readiness Review
|
TRR,Test Readiness Review
|
||||||
UC,Users Committee
|
UC,Users Committee
|
||||||
UK ATC,UK Astronomy Technology Centre
|
UKSA,United Kingdom Space Agency
|
||||||
Ultracam,High-speed camera (VLT)
|
Ultracam,High-speed camera (VLT)
|
||||||
UltraVISTA,Ultra-deep near-infrared survey in the COSMOS field
|
UltraVISTA,Ultra-deep near-infrared survey in the COSMOS field
|
||||||
UNCOPUOS,United Nations Committee for the Peaceful Uses of Outer Space
|
UNCOPUOS,United Nations Committee for the Peaceful Uses of Outer Space
|
||||||
|
|
Loading…
Reference in New Issue
Block a user