Commit Graph

141 Commits

Author SHA1 Message Date
nathangray
f5ec39200b Fix not working infinite loop check
(thanks, Scrutenizer)
2017-02-01 09:17:26 -07:00
nathangray
b799dda8c7 Some bugfixes:
- For some start / end date combinations, end date was incorrectly processed
- Check readonly flag to avoid errors from drag & drop, click to create and drag to create
2016-10-14 13:34:58 -06:00
nathangray
d28dc1451e Always pass owner when creating a new appointment, server will check preference and decide who to add as participants. Fixes one more case where 'Just me' preference was not correctly handled - single week, single other user. 2016-10-04 09:47:41 -06:00
nathangray
16d7b6d5ae Fix clicking inside a single other user's calendar did not invite that user when new event preference was 'Just me' 2016-09-27 10:21:25 -06:00
nathangray
78593797c9 Fix day header coloring from other months was kept when the week was reused 2016-09-01 10:36:43 -06:00
nathangray
085ac5bb38 Fix week view with multiple users (non-consolidated) still had some space where the user could click on the day header, which was recogized as a header click instead of an all day non-blocking click 2016-07-25 11:22:49 -06:00
nathangray
386368da6e Better sizing for calendar in home 2016-07-25 11:22:49 -06:00
nathangray
983cfab70d - Fix drag & drop an event inside a group or consolidated calendar asked to move or invite
- Fix some drag to create bugs throwing errors
2016-07-11 15:23:29 -06:00
nathangray
76307c4bbf Allow contact lists as event participants 2016-07-06 13:19:54 -06:00
nathangray
3de70526d0 Fix some bugs in drag to create event
- Firefox needed drag helper explicitly removed
- bug in move exceptions caused SQL error
2016-07-05 13:14:10 -06:00
nathangray
0a129c0214 Fix some bugs in drag to create event
- Firefox tried to do drag to create & drag to resize when resizing an event
- Speed improvement for mouseover
2016-07-04 10:26:38 -06:00
nathangray
4d3cf6c58e Make sure single day does not get partially covered by todos 2016-07-04 09:17:34 -06:00
nathangray
0aaca03d89 Fix some bugs in drag to create event
- Firefox opened 2 popups, one for span and one for end time
- Dragging existing events longer or shorter created a new event also
- Did not work in dayview
- Categories from category planner were not set
2016-07-01 11:57:06 -06:00
nathangray
b7919b1fe0 * Calendar: Create new events by dragging on empty space 2016-06-30 13:21:13 -06:00
nathangray
0962d7fb27 Better/more hiding of calendar redrawing when changing views 2016-06-24 15:31:39 -06:00
Hadi Nategh
5551832c4d Revert commit d95a6f82ab as it breaks calendar loading 2016-06-23 17:38:32 +02:00
nathangray
d95a6f82ab Better/more hiding of calendar redrawing when changing views 2016-06-22 09:57:14 -06:00
nathangray
0d77d8e62a Better handling for drag & drop of multi-day events between blocking & non-blocking areas 2016-06-08 10:16:17 -06:00
nathangray
b3e8a5e38c Fix drag and drop 'Move to' with all day non-blocking events in day view did not remove original user 2016-06-07 16:14:11 -06:00
nathangray
974c6105e1 Fix day view drag and drop invite / move action for drop on own all day non-blocking section 2016-06-02 10:01:12 -06:00
Hadi Nategh
87fb94a496 Deprecate $j global variable and replace them all with standard jQuery 2016-06-02 16:52:01 +02:00
nathangray
660888c716 Drag and drop move or invite in day view 2016-06-01 13:47:18 -06:00
nathangray
6d10b8d231 Drag and drop to another user's calendar
- Add exception prompt
- Change to -> Move to
2016-06-01 09:30:42 -06:00
nathangray
fba129a80b Fix drag and drop event to all day area no longer works 2016-05-30 09:34:28 -06:00
Nathan Gray
c6e6da63ef Allow drag and drop between calendars, asking to invite or transfer 2016-05-11 17:29:58 +00:00
Nathan Gray
e7763189b1 Some more print improvements:
- Fix day & week height in FF
- Fix todos not hidden
2016-05-10 16:03:26 +00:00
Ralf Becker
429177686a make home a regular application, which can eg. disabled, incl. moving all services using "home" as appname to "api" and moved some other forgotten stuff from phpgwapi&etemplate to api 2016-05-01 09:57:48 +00:00
Nathan Gray
40bdd2771d Fix all day non-blocking overflow calculation causing false positives 2016-04-27 22:23:06 +00:00
Nathan Gray
4ef7afca9e Hide granularity change so you don't have to see it 2016-04-25 22:09:57 +00:00
Nathan Gray
5d5e45e1ad Some more performance improvements when scrolling through weeks:
- Fix typo causing unneeded time resize before redraw
- Change daycol resize & event sizing, eliminating the need to resize all events when daycol changes size
- Fix check for existing week by only checking day, not whole time
- Better handling of scrolling through weeks for faster update
2016-04-21 19:00:21 +00:00
Nathan Gray
4d5b923ad7 Fix for previous mousover scrolling, which broke all hovering in timegrid 2016-04-21 15:58:50 +00:00
Nathan Gray
4a2b0e7aaa Stop little scrolling when mouseover day header, then all day events 2016-04-21 15:32:43 +00:00
Nathan Gray
88338c2c8c Stop little scrolling when mouseover week label or header with long (ends 21:00+) days 2016-04-20 17:25:06 +00:00
Nathan Gray
20a191464b Keep a single day/week on one page 2016-04-19 22:57:23 +00:00
Nathan Gray
40cff39e5a Improvements to printing in Firefox 2016-04-19 22:45:43 +00:00
Nathan Gray
ce4dd3420d Fix drag and drop in grid list view (month) 2016-04-07 16:48:41 +00:00
Nathan Gray
ef6f689121 - Fix loading overlay on home was not removed
- Fix missing initial data on home
2016-04-06 22:23:43 +00:00
Nathan Gray
d0bbcc98da Slight improvement for printing calendar in Firefox - it shows start of workday now instead of 00:00 2016-04-06 18:31:13 +00:00
Nathan Gray
b18d7a407b Make week numbers look like links 2016-04-05 21:48:57 +00:00
Nathan Gray
211d3a5438 Fix drag and drop across some months could change event to the wrong (± 1) month - now works with any date format 2016-04-04 22:06:01 +00:00
Nathan Gray
e79b418f04 Fix click on label / week number changes to that owner / week 2016-04-04 21:51:06 +00:00
Nathan Gray
4553b4c3be Fix drag and drop across some months could change event to the wrong (± 1) month 2016-04-04 16:03:59 +00:00
Nathan Gray
6f07b8384f Fix some issues with calendar owner name
- contacts would sometimes show week name and contact name
- Long owner names for first week would overflow onto the times
2016-03-31 22:32:13 +00:00
Nathan Gray
0f18558682 Print function for calendar 2016-03-31 20:55:41 +00:00
Nathan Gray
e764d36d0a Fix drag to change duration was often 1/2 hour too short 2016-03-24 18:47:58 +00:00
Nathan Gray
cd8632e354 Some fine adjustments for display of events right at the edge of the work day 2016-03-24 17:28:51 +00:00
Nathan Gray
8cfe88056f Stop Firefox from immediately hiding the hover div 2016-03-22 17:57:17 +00:00
Nathan Gray
995c6d38b4 Highlight working hours 2016-03-22 15:09:39 +00:00
Nathan Gray
3ea15bf95c Add some missed cases for adding new events:
- click on day in month view
- context menu with no specific time (month view)
- fix all day non-blocking in header no longer created a new event
2016-03-09 18:10:43 +00:00
Ralf Becker
3a9c0c237b fixing scope of "use strict", so we do not need to remove it when concatinating our scripts like we do now with minjs, also enabled "use strict" for calendar/js/app.js and fixed a reference error found by it 2016-03-01 16:27:45 +00:00