Commit Graph

63 Commits

Author SHA1 Message Date
Ralf Becker
8d2194f191 Fixed daylight saving change error using new egw_time class:
At the date when the change occured - yesterday ;-) - starttimes where
wrong by one hour, because difference of timestamp of daystart and
current time was one hour more (because of the switch)
2009-10-26 08:17:06 +00:00
Klaus Leithoff
d9531fb421 fix for timesheet edit tabs problem; tabs showed, even if set to readonly; 2009-09-24 12:42:54 +00:00
Stefan Becker
ccabb6d5f7 added History Log for timesheet 2009-09-10 08:20:27 +00:00
Stefan Becker
3818c671cc setting an individual status to multiple timesheet via a action method like the Addressbook and the Inlolog status. Sponsored by Martin Frimmel 2009-03-23 09:53:03 +00:00
Ralf Becker
5261728792 Fixed not working custom fields:
- SQL error when storing cfs
- csv export did not contain cfs (reported by Frank Becker)
- list did not contain cfs
- list caused check of attachments for every single entry, without
  displaying the attachments
- empty cf values got stored in db
--> had to rework the whole cf stuff :-(
2008-10-15 16:37:23 +00:00
Ralf Becker
448705bc3f width: 100% instead of fixed width 2008-08-04 12:48:01 +00:00
Ralf Becker
81f08a87ea allow to select prices from all linked projects, not only the main one 2007-01-12 01:27:37 +00:00
Ralf Becker
6bef8418f1 - the level of integration with projectmanager is now configurable:
+ Both: allow to use ProjectManager and free project-names
 + None: use only free project-names
 + Full: use only ProjectManager
- new filter for none-selected for category and project
--> requires an updated trunk etemplate version!!!
2006-09-12 15:21:23 +00:00
Ralf Becker
cd69f5bb27 - bugfix: [Save & New] lost links, now it can be used as a copy too
- [Add] button is now also on the top rights of the list (custom dates are on the left now)
- instead of a start-date+time plus the duration, you can now specify the start+date (required) plus 2 out of the following 3: start-time, duration, end-time
- the end-time for new entries is set to the aktual time, so you only need to fill the duration for a task you just finished
2006-09-12 10:37:13 +00:00
Ralf Becker
5d29337843 - added/corrected rounding of quantity and prices
- range-sums are only shown if the date-filter includes the full-range (otherwise you got an incorrect sum)
- day-sums only for less or equal 6 weeks
- more meaningful app-header / report title
- disabled owner column in print, if filtered by one owner
- state of details/no details is now saved in the user prefs, to be persistent over sessions
- minutes are allowed as additional input-unit for times
2006-03-27 12:20:06 +00:00
Ralf Becker
6c4cda6bfc added ability to add timesheets to infolog entries 2006-03-21 13:52:49 +00:00
Ralf Becker
15201df1b5 improved projectmanager integration, specially pricelist plus some bugfixes 2006-01-11 05:17:15 +00:00
Ralf Becker
9f638e4f08 Initial revision 2005-12-19 04:23:14 +00:00