Tim Beatham
352648b7cb
main
...
- Fixed problem where connection not removed on error
2023-12-29 11:12:40 +00:00
Tim Beatham
fe14f63217
53-run-commands-pre-up-and-post-down
...
- Ability to run a command pre up and post down
- Ability to be a client in one mesh and a peer in the other
- Added dev card to specify different sync rate, keepalive rate per
mesh.
2023-12-10 19:21:54 +00:00
Tim Beatham
64885f1055
45-use-statistical-testing
...
Using statistical testing to test whether the node has failed.
2023-12-07 01:44:54 +00:00
Tim Beatham
b179cd3cf4
Hashing the WireGuard interface
...
Hashing the interface and using ephmeral ports so that the admin doesn't
choose an interface and port combination. An administrator can alteranatively
decide to provide port but this isn't critical.
2023-11-20 13:03:42 +00:00
Tim Beatham
acbeb689b5
Prune nodes if they exceed their timeout time
2023-11-06 13:37:28 +00:00
Tim Beatham
c88012cf71
Added health system to count how many times a node
...
fails to conenct.
2023-11-06 09:54:06 +00:00
Tim Beatham
472718c9a3
Standardising filenames, interfacing out
...
for tests and modifying network device
manipulation
2023-10-28 16:38:25 +01:00
Tim Beatham
4c6bbcffcd
Interfacing out components for unit testing
2023-10-26 16:53:12 +01:00
Tim Beatham
180f5e226c
Ability to be in multiple meshes and refactored consensus
2023-10-24 16:00:46 +01:00
Tim Beatham
8e89281484
Tested with large number of nodes
2023-10-24 00:12:38 +01:00
Tim Beatham
ef2b57047d
Bidirectional syncing
2023-10-23 18:13:08 +01:00
Tim Beatham
976dbf2613
Automatically remove nodes from the mesh after a
...
certain threshold.
2023-10-20 17:35:02 +01:00
Tim Beatham
c200544cee
Timer in go that syncs with random nodes in the mesh every
...
given time interval.
2023-10-20 12:41:06 +01:00
Tim Beatham
ec87afc235
Added sync
2023-10-10 20:14:40 +01:00